As for the foundation you dig more deeply than freezing depth

“Recent very being, annual utilization increases, but because it is the resort area where originally Karuizawa has become famous as a camp, as for utilizing the villa residence just summer season.The person that was the majority in the winter when there are also times when minimum air temperature reaches about 20 degree in Karuizawa it is not passed, it is”, as for saying, the willow of Seibu construction works section department manager who has the operation result which exceeds 1000 ridges in Karuizawa sawa Yoichi.

Assuming, that you do not use in the winter, as for the foundation and the like it is necessary to make cold area specification.That, at cold area the moisture of the earth to freeze, because the earth freezes, is.The earth swells up with freezing, raises the building, there are also times when the building is warped.Then, the footing which supports the foundation (the batholith), it is necessary the depth where the earth freezes compared to make under.

The depth where this earth freezes is called freezing depth, at the Karuizawa building where the Seibu construction participates 70 centimeters or more investigating, is operated.Depending upon the area and altitude etc, because this freezing depth changes, as for the accuracy as for the number it will try inquiring to the city planning section and the aqueduct section of the public office.

As for water supply hot water supply anti-icing measure

As for piping of water supply hot water supply, it is important to try not to make freeze.winter, if you do not want to use is that you disconnect the water. this work, conduct a management contract villa, some of the administrative office where the staff do, there is also at the base of people who do use the villa, varies in the area villa.

the case of my hut, always after using the summer vacation, go again before winter, i had a drainage, that year include the relocation of husband, went off to summer vacation. weep, but i had been, forget to have antifreeze flowing into the toilet, if you go to the next year’s holidays, the toilet bowl had been ruptured. because some water remains in the toilet, frozen and put antifreeze in there unless, the toilet bowl is broken up. at that time, really was troubled. if you have ordered a repair to replace the toilet bowl, about15it took ten thousand yen. please take care everyone.

there is also a way of recent anti-freeze mr. yanagisawa is referred to as. floor heating in the way of regenerative power by midnight, embedded in the foundation pit, he is so warm it to prevent freezing. the cost is, construction costs plus a normal basis70million yen~100million yen, is time to freeze in winter months as the running cost3000yen~5000it takes about ¥, is that when ready for use immediately after it came. drainage and water issues and ask the management office, each time1it takes about ten thousand yen from, true running costs are not high considering it. it is said that recent material is also difficult to freeze in the piping and also.

built-in types, such as dishwasher, because some water does not come out, you will not be able to use such devices to freeze and choose is that because, when you purchase equipment surface, try to verify the contractor’s local.

as measures against cold

in order to maintain the warmth of the indoor, is to increase the thermal insulation of the opening elusive mr. yanagisawa and. is often used with high insulation and glazing3double glass. aluminum sash are so many condensation on the frame sash, aluminum sash sash and resin insulation, the total is also used wooden sash. airtight, the case of high thermal insulation housing, you will need consideration is ventilation.

as is also characteristic of recent, floor heating is so has been an increase. estimated construction cost is20tatami mat is about70about ten thousand yen. electricity, kerosene, you can choose from gas, running costs are increasing electricity is convenient operation is simple. it is cheap and that of kerosene will. floor heating is slow rising, it takes time to warm up from room, with immediate effectFFwill be used in combination with a good stove and wood stove, etc..

wood stove also has a heat capacity, equipment is popular because there is a soft warmth. in order not to cause a commotion voyages, the chimney2that safety is if you leave the heavy chimney. from the wood stove is often given after.

for exterior wall and roof

for exterior walls absorbent material is avoided, so good mr. yanagisawa and. so i should be fine, but quality porcelain and ceramic tile finish when used, if the quality and quality stoneware pottery is likely that the surface of the tile is to peel off by frost damage. depending on the altitude, etc., law such as when to use an accent note a good idea.

in the roofing material used in the villa, a popular steel plate has recently garubariumu. it is said that it is often used also good designs and colors at low cost. colonial natural texture is characterized by, such as fallen leaves and dead branches is less likely to slip, it seems to cause damage to roof. also washed out, such as black, 10the color also known as volatile over long years and.

karuizawa is a large area larch, because larch drop leaves in winter, easier to accumulate on the valley of the roof. the valley of the roof is easy to accumulate snow as well as fallen leaves, as often is the cause of the leak is hard to melt, especially north. many valley from the roof will be in the form and complex, more simple design is as good as possible.

the villa has a large wood deck for most, durability in a wood deck will change, whether or not there is a roof. it lasts longer wood by applying a coating frequently, has recently also jara nonperishable materials such as plastics and materials containing.

flow of work

at the end, we asked whether dekiagaru villa in the mean flow. if seibukensetsu, schedule is as follows:.
1 planning (meeting)
2 drawings
3 estimate
4 contract
5 ground rope witness
6 groundbreaking
7 construction
8 interior structure and internal inspection house inspection
9 completion
10 owner in-house inspection
11 delivery

as a smooth flow, foundation to finished until the cold, during the winter months, construction carpenter. construction was finished the warm finish, 5case that the delivery to mon weekend.
or3to start the construction work in around, flow that is passing in summer. snowy area, such as karuizawa, in winter can be so difficult foundation work, well let’s setup a schedule set. i can use that to do so soon.

Incoming search terms: